LABARNA AI / CONSTRUCTION

From site
to boardroom.
Connected.

Every project. Every trade.
One connected operation.

Follow a 34-floor building in the Middle East through Rimal Construction OS. Labarna connects drawings, crews, materials, schedules and commercial performance through our sovereign AI engine.

Connect the technology you already use, or operate a standalone platform built around your business.

Watch the construction story
A SELECTED EXAMPLE / 21 INDUSTRIESFIELD TO OFFICE · PLAN TO DELIVERY
02

Inside Rimal Construction OS

03:04
Client-authorized demonstration / simulation

Use the player timeline to explore the walkthrough.

AT THE CENTRE / CONSTRUCTION ECONOMICS

The same project.
Two distinct views.

Compare budgeted and actual costs for the same completed work. General contractors track their project costs; subcontractors track the delivery costs of their own package.

SIMULATED RESULTS / SEPARATE COMPANY COST LEDGERS

PROJECT34-floor residential towerMiddle East · demonstration assumptions
GROSS INTERNAL AREA55,000 m²Assumed building area
BUILDING WORKS ALLOWANCEAED 5,818 / m²AED 320m total · Q1 2025 price basis

Building works include fit-out and services. Land, professional fees, finance, VAT, parking and external works are excluded. A 2025 UAE cost benchmark informs this Middle East example; the savings below are simulated, not measured client results.

DailyMonth to dateClosed monthProject to date SHOWN
01 / GENERAL CONTRACTOR

The project view.

Cost-reconciled work across the project

Building works budgetAED 320mConstruction scope · not total development cost

Budgeted cost of assessed work
AED 98.40m
Actual cost, including accruals
AED 89.75m
Gross cost savings
AED 8.65m
Allocated platform / service fees
AED 0.65m
SIMULATED NET SAVINGS
Project to date
AED 8.00m
02 / SUBCONTRACTOR

The package view.

Mechanical / HVAC package within MEP

Specialist subcontract valueAED 28.5mContract revenue · separate from the delivery costs below

Budgeted cost of assessed work
AED 7.20m
Actual cost, including accruals
AED 6.64m
Gross cost savings
AED 560,000
Allocated platform / service fees
AED 60,000
SIMULATED NET SAVINGS
Project to date
AED 500,000

Each company uses its own cost ledger. These savings are not added together. A subcontractor’s lower delivery cost does not automatically reduce the GC’s fixed-price commitment.

Savings cover assessed completed work with reconciled costs, not the dashboard’s physical progress percentage. Budgeted and actual costs exclude VAT. Actuals include accrued delivery costs and exclude the platform and service fees shown separately. Those fees are simulation assumptions, not quoted pricing.

Incomplete stays incomplete. Work with missing costs remains pending and is excluded from recognized savings. Forecasts are kept separate from earned results; overruns remain visible.

SHARED PROJECT. PRIVATE COMMERCIAL RECORDS.

Teams coordinate the shared work while each subcontractor’s private company costs and restricted records remain protected.

23AGENTS IN THE
DEMONSTRATION TEAM

LABARNA AI / DRIVEN BY OUR SOVEREIGN ENGINE

A coordinated team.
A clear line of authority.

Specialists bring together field evidence, sequencing, productivity, materials, cost and weather analysis. Their recommendations carry sources, assumptions and proposed actions for your team to review.

This demonstration extends the current 16 specialist analysis roles with seven proposed coordination and support roles. It illustrates a 23-agent configuration; it does not represent 23 deployed roles.

BUILT AROUND YOUR BUSINESS

Choose how it fits.
Choose how you own it.

Your operating setup and your commercial arrangement are two separate choices.

01

Your operating setup

Connect what you have.

Bring authorized information from your existing tools into one coordinated operation. Integrations are scoped around the systems, access and workflows you already use.

CONNECTED DEPLOYMENT

Run a complete platform.

Bring project delivery, commercial control, documents and team coordination together in a standalone construction environment.

STANDALONE DEPLOYMENT
02

Your commercial arrangement

A software package.

Use the platform through an agreed software package, with the scope, access and service arrangements defined for your organization.

PACKAGE ACCESS

Direct ownership.

Commission a platform as your own business asset. Define the source-code handover, deployment and ongoing support in your ownership agreement.

YOUR PLATFORM. YOUR CONTROL.

For a bespoke platform central to your long-term operation, direct ownership is our recommended starting point when control and independence are priorities.

YOUR PROJECTS. YOUR NEXT CHAPTER.

What could this connect
in your business?

Talk to RAI about construction